Home. HHO BLOG. HHO Generator. Lean Burning. HHO EFIE . O2 Sensor Spacer. Measure Consumption. Increase fuel economy. Full HOD. Safety Instructions. Site map. About Us. Hydrogen First Aid

Please help to share the Knowledge >>

HHO RSS FEED HHO RSS FEED HHO RSS FEED

This is the place where everything come together. All the wallplates must be assembled to one array that will hold them in parallel to each other.

We actually get here two separate cells connected in a row. This is done to reduce voltage on each pair of plates and gain extra efficiency instead of heat.

The result - more gas is produced and less heating occurs.

The plates insulated from each other using nylon washers. The thickness of the nylon washers is 1/16” or 1.6 mm, a number the gave the best result during experiments.

The PVC walls used in the next step to give a solid ground to the duct tape which wrapping the array.


The SSL strips are isolated to prevent unwanted leakage current in the water.     

Part name

Quanti ty

Where to get

Notes

Wallplates -

after treatment

12

Make them yourself


PVC side plate

2

Make them yourself


Isolated SSL strip #1

1

Make it yourself


Isolated SSL strip #2

1

Make it yourself


Isolated SSL strip #3

1

Make it yourself


SSL washer 3/8”

Thickness 3/64”

2

Hardware store

Option:SSL washer M10

Thickness 1mm

SSL nut 3/8”

Height 7/32”

8

Hardware store

Option: SSL nut M10

Height 6.5 mm

Nylon washer 3/8”

Thickness 1/16”

20

Hardware store

Option:Nylon washer M10 Thickness 1.6mm

Plastic threaded rod 3/8”

Length 2 1/4”

2

Hardware store

Option:Plastic threaded rod M10 Length 60 mm

THE PLATES ARRAY Next. Back.